Author: Electric Power Research Institute
Focus: Compiles field studies on impingement and entrainment
Date: 12/1/00
Location: Hudson River, California, Florida
Component: Intake
Author: Electric Power Research Institute
Focus: Literature review of I&E studies
Date: 7/1/11
Location: North America, Europe
Component: Intake
Author: Amec Foster Wheeler
Focus: Basis of design for proposed desal at Harbor Island
Date: 12/1/17
Location: Harbor Island
Component: Plant
Author: Port of Corpus Christi Authority
Focus: Permit requirements for brine discharge
Date: 8/20/18
Location: Port Area
Component: Plant
Author: Wood Environment & Infrastructure Solutions, Inc.
Focus: Best practices of intake structure planning and design
Date: 12/11/18
Location: Port Area
Component: Intake
Author: Wood Environment & Infrastructure Solutions, Inc.
Focus: Results of benthic, sediment and water quality sampling
Date: 6/1/19
Location: Harbor Island
Component: Sediments
Author: Lloyd Engineering / T Baker Smith
Focus: Survey data
Date: 8/13/19
Location: Harbor Island
Component: Plant
Author: LRE Water, LLC
Focus: Modeling for brine discharge in Corpus Christi Bay
Date: 10/21/19
Location: Corpus Christi Bay System
Component: Discharge
Author: Texas A&M HRI – Mukesh Subedee & Jim Gibeaux, Ph.D.
Focus: Assessment of relative effect of channel deepening scenarios on salinity, storm surge, and tidal velocity
Date: 4/1/21
Location: Corpus Christi Bay System
Component: Plant
Author: StillMeadow, Inc.
Focus: EPA Whole Effluent Toxicty Testing on Inland Silverside
Date: 6/23/21
Location: Not Applicable
Component: Discharge
Author: StillMeadow, Inc.
Focus: EPA Whole Effluent Toxicity Testing on Shrimp
Date: 6/23/21
Location: Not Applicable
Component: Discharge
Author: StillMeadow, Inc.
Focus: EPA Whole Effluent Toxicity Testing on Sheepshead Minnow
Date: 6/23/21
Location: Not Applicable
Component: Discharge
Title: Field Sampling Technical Memorandum for Port of Corpus Christi Draft TPDES Permit No. WQ0005253000
Author: Parsons
Focus: Summary of ambient velocity, bathymetry, and water quality sampling
Date: 6/24/21
Location: Harbor Island
Component: Discharge
Author: Lial Tischler, P.E., B.C.E.E.
Focus: Conceptual design of high-rate diffuser for Harbor Island desal discharge
Date: 6/24/21
Location: Harbor Island
Component: Discharge
Author: StillMeadow, Inc.
Focus: EPA Whole Effluent Toxicity Testing on Inland Silverside and Shrimp
Date: 7/18/21
Location: Not Applicable
Component: Discharge
Author: Texas Commission on Environmental Quality
Focus: Evaluation of performance of proposed diffuser
Date: 8/10/21
Location: Harbor Island
Component: Discharge
Author: Texas Commission on Environmental Quality
Focus: Review of revised diffuser design and outfall location
Date: 8/10/21
Location: Harbor Island
Component: Discharge
Author: Texas Commission on Environmental Quality
Focus: Tier 1 Anti-degradation Review against Texas Surface Water Quality Standards
Date: 8/19/21
Location: Harbor Island
Component: Discharge
Author: Texas Commission on Environmental Quality
Focus: TMDL Review
Date: 8/26/21
Location: Harbor Island
Component: Discharge
Author: Dr. Lance Fontenot, Integral Consulting Inc.
Focus: Evaluation of potential impacts from effluent related to biological and ecotoxicological
Date: 1/13/22
Location: Harbor Island
Component: Discharge
Author: Port of Corpus Christi Authority
Focus: Overview of proposed desal facility for resource agencies
Date: 2/7/23
Location: Harbor Island
Component: Plant
Author: Integral Consulting Inc.
Focus: Evaluates I&E potential for marine life in Gulf of Mexico for Harbor Island desal intake structure
Date: 2/9/23
Location: Harbor Island, Gulf of Mexico
Component: Intake
Author: Parsons & KIT
Focus: Construction methodology for intake in Gulf of Mexico
Date: 2/9/23
Location: Harbor Island, Gulf of Mexico
Component: Intake
Author: Parsons & KIT
Focus: Basis of design for the water intake structure, tunnel, and intake screens for intake in Gulf of Mexico
Date: 2/9/23
Location: Harbor Island, Gulf of Mexico
Component: Intake
Title: DRAFT – Desalination Brine Discharge Modeling – Corpus Christi Bay System EFDC+ Modeling Report
Author: LRE Water, LLC
Focus: Assessment of relative effect on ambient conditions resulting from brine discharges in vicinity of La Quinta Channel
Date: 10/30/23
Location: La Quinta
Component: Discharge
Author: Port of Corpus Christi Authority
Focus: Monitoring Plan to demonstrate compliance with monitoring requirement in Discharge Permit
Date: 11/1/23
Location: Harbor Island
Component: Intake
Title: Sampling, Chemical Analysis, and Bioassessment for Offshore Disposal of Dredge Material
Part One, Part Two, Part Three
Part One, Part Two, Part Three
Author: Terracon Consultants, Inc.
Focus: Results of benthic, sediment and water quality sampling
Date: 11/17/2023
Location: Harbor Island
Component: Plant, Discharge
Author: Integral Consulting Inc.
Focus: Simulation of particle passing through discharge
Date: 2023
Location: Harbor Island
Component: Discharge
Author: Integral Consulting Inc.
Focus: Simulation of particle passing through discharge
Date: 2023
Location: Harbor Island
Component: Discharge
Author: Integral Consulting Inc.
Focus: Simulation of particle passing through discharge
Date: 2023
Location: Harbor Island
Component: Discharge